RECON’s experience with large-scale site development projects with challenging geotechnical conditions or environmental concerns far exceeds that of any of our competitors. RECON has been the site development contractor on seven projects since 2006 with capitol budgets ranging from $1.5 billion to $12 billion. We provide alternative approaches to standard construction practices that resolve environmental or geotechnical concerns and thereby allowing sites such as dredge piles or waste management units to be used for large capital improvement projects.

RECON is able to optimize schedule while minimizing costs and resource requirements through detailed evaluation of site conditions and collaboration with EPCs in order to maximize value. Our experience and expertise has allowed our team to consistently deliver high levels of performance including situations where our competitors have failed. Trust our remediation experience, innovative geotechnical technologies, and proprietary stabilization techniques to reclaim ground once deemed unsuitable for expansion due to low strength or contamination.

  •  Over 25 years of experience
  • 1,500 acres stabilized and repurposed to date
  • 11,000,000 cubic yards of contaminated soil and sludge stabilized to date
  • Proprietary and patented technologies
  • Extensive documented savings for numerous clients
  • Expert project management, controls and reporting
  • Comprehensive QC program

 

  • Ground Stabilization

    soil-stabilization

    Soil stabilization reduces the mobility of hazardous substances in the environment through both physical and chemical means. Instead of removing the contaminated material and amassing...
    Read More »

  • Treatability Center

    Treatability Center

      Soil matrixes are arguably the most challenging medium to treat. To develop treatment strategies for physical, chemical, biological, and thermal techniques, RECON has developed...
    Read More »