Soil Remediation on Chevron’s Fillmore Works Site

RECON is proud to have worked with Chevron on the Fillmore Works Site providing environmental remediation services for a mandatory EPA cleanup and future beneficial reuse program.

RECON’s Scope of Work Included:

  • Performed an infrastructure removal of insulation, concrete, brick, and pipe.
  • Removed 29,000 cubic yards of contaminated soil.
  • Installed 110,000 cubic yards of mass grading and a storm water system installation.
  • Installed a geosynthetic clay liner over two on-site consolidation areas.
  • Used GPS units to assist in the excavation and grading.