recon services logo


Employee Portal
Tel: (281) 955-2442

  • Soil remediation, one discipline within the broader scope of environmental remediation, is the process of decontaminating soil. RECON is an industry leader in soil and sludge stabilization and solidification.
  • A secant wall is used in deep foundations in situations where the surface soil layers are unstable.
  • Among the processes used in soil remediation, excavation and dredging are among the most common. The process involves extracting unrecoverable contaminated soil.
  • Secant pile walls are one of the most economical methods of creating effective water control barriers for building structural walls, top-down tunnels and dams.
  • Deep Soil Mixing is a in-situ soil improvement technology used to construct cutoff or retaining walls and to treat contaminated soils.
  • This sludge pond is a good candidate for bio remediation or stabilization.
  • RECON's excavator is capable of digging a slurry wall up to 100 ft deep. Slurry walls have been used for decades to provide cost-effective, long-term solutions for many groundwater control problems.
  • Soil remediation project using remote placement conveyor.
  • Driving concrete pile to strengthen and support structural foundations.
  • Slurry wall construction is used to create non-structural barriers (Cutoff Walls, Slurry Trenches), which are constructed underground to impede groundwater flow.

Concrete Work

 

Structural reinforced concrete is one of the most common building materials used in the construction industry today and can be classified as either precast or cast-in-place. Reinforced concrete is used in grade beams, tank rings, equipment foundations, pier caps, columns, retaining walls, ramps, parking lots, drainage structures, and slope lining.

Site Preparation and Concrete

 

RECON was contracted in association with our sister company, G.R. Birdwell, to perform a joint venture with the General Contractor for a construction project to design, procure, install, and start-up a process waste facility in El Paso, Texas.

 

concrete work

 

Project Summary

 

• Preparing the site for construction including site grading and installation of temporary facilities

 

• Designing and installing all concrete foundations and paving

 

• Designing and installing all structural steel

 

• Installing all mechanical piping and equipment.